carfindervin@gmail.com
Home » Inventory » BMW » 2015 BMW M4 – WBS3R9C55FK331354
VIN: WBS3R9C55FK331354

2015 BMW M4 – WBS3R9C55FK331354

$12,250
Hide car
MakeBMW
ModelM4
Odometer94009
FuelGasoline

Description

This 2015 BMW M4 (Black) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS3R9C55FK331354), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2015 BMW M4 (Black) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 94,009 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Front End
  • Secondary damage: Suspension

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS3R9C55FK331354
Lot ID43575263
Sale Date2025-11-26
ColorBlack
Odometer94009
Fuel TypeGasoline
Primary DamageFront End
Secondary DamageSuspension

VIN Breakdown for WBS3R9C55FK331354

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS3R9C55FK331354 reveals about this 2015 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)F — 2015
Assembly plant code (11th digit)K
Vehicle descriptor section (VDS)3R9C5
VIN check digit (9th)5
Production serial number331354

About This 2015 BMW M4

This 2015 BMW M4 surfaced at the auction yard in North Hollywood (CA) and is now fully searchable by its VIN. At the time it was catalogued the odometer showed 94,009 miles, and the exterior is listed as Black. Since the record is VIN-linked, it stays consistent with title, insurance and accident databases where available.

Understanding the Reported Damage

Front-end damage usually involves the bumper, hood, radiator support, headlights and sometimes the airbags. Inspect the photos for frame or core-support deformation, which is costlier to repair than cosmetic panel damage.

Frequently Asked Questions

Is the VIN WBS3R9C55FK331354 salvage or auction history?

This page collects the public auction record tied to VIN WBS3R9C55FK331354. It indicates the 2015 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2015 BMW M4 located?

The most recent auction listing placed this vehicle at North Hollywood (CA). Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS3R9C55FK331354?

Yes. Enter the VIN WBS3R9C55FK331354 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS3R9C55FK331354, not stock photography.

Market analysis for this 2015 BMW M4

We hold 5 comparable BMW M4 auction results from 2013–2017. Across those sales the average price was $16,240, ranging from $9,200 to $23,500.

This particular car sold for $12,250 — 24.6% below the comparable average. Prices this far below the comparable average usually reflect heavier damage, higher mileage, or missing paperwork — the photos and damage fields above are the place to check which applies here.

Its recorded odometer reading of 94,009 miles compares with an average of 49,923 miles across the comparable group — roughly 44,086 miles more.

The most frequently reported primary damage among comparable M4 listings is Front End (4 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.