carfindervin@gmail.com
Home » Inventory » BMW » 2021 BMW M4 – WBS33AZ03MCG68386
VIN: WBS33AZ03MCG68386

2021 BMW M4 – WBS33AZ03MCG68386

$37,500
Hide car
MakeBMW
ModelM4
Odometer30452
FuelGasoline

Description

This 2021 BMW M4 (Grey) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS33AZ03MCG68386), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2021 BMW M4 (Grey) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 30,452 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Front End
  • Secondary damage: Unknown

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS33AZ03MCG68386
Lot ID51322703
Sale Date2023-07-26
ColorGrey
Odometer30452
Fuel TypeGasoline
Primary DamageFront End
Secondary DamageUnknown

VIN Breakdown for WBS33AZ03MCG68386

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS33AZ03MCG68386 reveals about this 2021 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)M — 2021
Assembly plant code (11th digit)C
Vehicle descriptor section (VDS)33AZ0
VIN check digit (9th)3
Production serial numberG68386

About This 2021 BMW M4

Listed out of the auction yard in IL - Southern Illinois, this 2021 BMW M4 is catalogued here under VIN WBS33AZ03MCG68386. Auction records put this car at 30,452 miles with a reported Grey finish. All of the data here is anchored to the VIN, so it lines up with independent history and title checks.

Understanding the Reported Damage

Front-end damage usually involves the bumper, hood, radiator support, headlights and sometimes the airbags. Inspect the photos for frame or core-support deformation, which is costlier to repair than cosmetic panel damage.

Frequently Asked Questions

Is the VIN WBS33AZ03MCG68386 salvage or auction history?

This page collects the public auction record tied to VIN WBS33AZ03MCG68386. It indicates the 2021 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2021 BMW M4 located?

The most recent auction listing placed this vehicle at IL - Southern Illinois. Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS33AZ03MCG68386?

Yes. Enter the VIN WBS33AZ03MCG68386 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS33AZ03MCG68386, not stock photography.

Market analysis for this 2021 BMW M4

We hold 46 comparable BMW M4 auction results from 2019–2023. Across those sales the average price was $31,964, ranging from $11,000 to $52,500.

This particular car sold for $37,50017.3% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 30,452 miles compares with an average of 19,213 miles across the comparable group — roughly 11,239 miles more.

The most frequently reported primary damage among comparable M4 listings is Front End (21 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.