carfindervin@gmail.com
Home » Inventory » BMW » 2022 BMW M4 – WBS43AZ02NCJ93932
VIN: WBS43AZ02NCJ93932

2022 BMW M4 – WBS43AZ02NCJ93932

$46,250
Hide car
MakeBMW
ModelM4
Odometer1186
FuelGAS

Description

This 2022 BMW M4 (BLACK) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS43AZ02NCJ93932), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2022 BMW M4 (BLACK) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 1,186 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: FRONT END
  • Secondary damage: MINOR DENT/SCRATCHES

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS43AZ02NCJ93932
Lot ID49828022
Sale Date2022-09-19
ColorBLACK
Odometer1186
Fuel TypeGAS
Primary DamageFRONT END
Secondary DamageMINOR DENT/SCRATCHES

VIN Breakdown for WBS43AZ02NCJ93932

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS43AZ02NCJ93932 reveals about this 2022 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)N — 2022
Assembly plant code (11th digit)C
Vehicle descriptor section (VDS)43AZ0
VIN check digit (9th)2
Production serial numberJ93932

About This 2022 BMW M4

Listed out of the auction yard in CO - DENVER SOUTH, this 2022 BMW M4 is catalogued here under VIN WBS43AZ02NCJ93932. Auction records put this car at 1,186 miles with a reported BLACK finish. Since the record is VIN-linked, it stays consistent with title, insurance and accident databases where available.

Understanding the Reported Damage

Front-end damage usually involves the bumper, hood, radiator support, headlights and sometimes the airbags. Inspect the photos for frame or core-support deformation, which is costlier to repair than cosmetic panel damage.

Frequently Asked Questions

Is the VIN WBS43AZ02NCJ93932 salvage or auction history?

This page collects the public auction record tied to VIN WBS43AZ02NCJ93932. It indicates the 2022 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2022 BMW M4 located?

The most recent auction listing placed this vehicle at CO - DENVER SOUTH. Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS43AZ02NCJ93932?

Yes. Enter the VIN WBS43AZ02NCJ93932 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS43AZ02NCJ93932, not stock photography.

Market analysis for this 2022 BMW M4

We hold 54 comparable BMW M4 auction results from 2020–2024. Across those sales the average price was $33,151, ranging from $11,000 to $60,550.

This particular car sold for $46,25039.5% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 1,186 miles compares with an average of 17,298 miles across the comparable group — roughly 16,112 miles less.

The most frequently reported primary damage among comparable M4 listings is Front End (24 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.