carfindervin@gmail.com
Home » Inventory » BMW » 2023 BMW M3 – WBS43AY09PFP46448
VIN: WBS43AY09PFP46448

2023 BMW M3 – WBS43AY09PFP46448

$46,750
Hide car
MakeBMW
ModelM3
Odometer36765
FuelGasoline

Description

This 2023 BMW M3 (Black) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS43AY09PFP46448), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2023 BMW M3 (Black) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 36,765 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: All Over
  • Secondary damage: Unknown

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS43AY09PFP46448
Lot ID54806574
Sale Date2024-07-11
ColorBlack
Odometer36765
Fuel TypeGasoline
Primary DamageAll Over
Secondary DamageUnknown

VIN Breakdown for WBS43AY09PFP46448

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS43AY09PFP46448 reveals about this 2023 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)P — 2023
Assembly plant code (11th digit)F
Vehicle descriptor section (VDS)43AY0
VIN check digit (9th)9
Production serial numberP46448

About This 2023 BMW M3

The 2023 BMW M3 shown on this page was processed through the auction yard in CA - Antelope and tied to VIN WBS43AY09PFP46448. The listing notes 36,765 miles on the clock and a Black exterior. All of the data here is anchored to the VIN, so it lines up with independent history and title checks.

Understanding the Reported Damage

When damage is reported "all over," the car has taken multiple impacts. Treat it as a parts or rebuild candidate and review every photo closely.

Frequently Asked Questions

Is the VIN WBS43AY09PFP46448 salvage or auction history?

This page collects the public auction record tied to VIN WBS43AY09PFP46448. It indicates the 2023 BMW M3 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2023 BMW M3 located?

The most recent auction listing placed this vehicle at CA - Antelope. Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS43AY09PFP46448?

Yes. Enter the VIN WBS43AY09PFP46448 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS43AY09PFP46448, not stock photography.

Market analysis for this 2023 BMW M3

We hold 62 comparable BMW M3 auction results from 2021–2025. Across those sales the average price was $34,201, ranging from $7,300 to $66,500.

This particular car sold for $46,750 — 36.7% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 36,765 miles compares with an average of 11,105 miles across the comparable group — roughly 25,660 miles more.

The most frequently reported primary damage among comparable M3 listings is Front End (29 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.