












2023 BMW M4 – WBS53AZ02PCM53253
Description
This 2023 BMW M4 (Green) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS53AZ02PCM53253), which helps confirm where the car was listed and what condition it was in at the time of sale.
The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.
Technical details
This 2023 BMW M4 (Green) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had mileage not provided at the time of sale.
Condition and reported damage
At the auction, the following damage was reported:
- Primary damage: Front End
- Secondary damage: Minor Dent/Scratches
Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.
Additional information
Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.
For the most accurate assessment, review all photos and all listed specifications before making any decisions.
Technical Specifications
| VIN Number | WBS53AZ02PCM53253 |
|---|---|
| Lot ID | 72139013 |
| Sale Date | 2023-12-01 |
| Color | Green |
| Fuel Type | Gasoline |
| Primary Damage | Front End |
| Secondary Damage | Minor Dent/Scratches |
VIN Breakdown for WBS53AZ02PCM53253
Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS53AZ02PCM53253 reveals about this 2023 BMW:
| World Manufacturer Identifier (WMI) | WBS — BMW |
| Country of manufacture | Germany |
| Model year code (10th digit) | P — 2023 |
| Assembly plant code (11th digit) | C |
| Vehicle descriptor section (VDS) | 53AZ0 |
| VIN check digit (9th) | 2 |
| Production serial number | M53253 |
About This 2023 BMW M4
Recorded at the auction yard in CT - Hartford, this 2023 BMW M4 carries the VIN WBS53AZ02PCM53253 and the details below. Auction records put this car at an unlisted odometer reading with a reported Green finish. All of the data here is anchored to the VIN, so it lines up with independent history and title checks.
Understanding the Reported Damage
Front-end damage usually involves the bumper, hood, radiator support, headlights and sometimes the airbags. Inspect the photos for frame or core-support deformation, which is costlier to repair than cosmetic panel damage.
Frequently Asked Questions
Is the VIN WBS53AZ02PCM53253 salvage or auction history?
This page collects the public auction record tied to VIN WBS53AZ02PCM53253. It indicates the 2023 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.
Where was this 2023 BMW M4 located?
The most recent auction listing placed this vehicle at CT - Hartford. Auction locations can change if a car is relisted.
Can I get a full history report for VIN WBS53AZ02PCM53253?
Yes. Enter the VIN WBS53AZ02PCM53253 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.
Are the photos of this exact car?
Yes — the images on this page are the original auction photos captured for VIN WBS53AZ02PCM53253, not stock photography.
Market analysis for this 2023 BMW M4
We hold 49 comparable BMW M4 auction results from 2021–2025. Across those sales the average price was $35,342, ranging from $15,400 to $60,550.
This particular car sold for $24,600 — 30.4% below the comparable average. Prices this far below the comparable average usually reflect heavier damage, higher mileage, or missing paperwork — the photos and damage fields above are the place to check which applies here.
The most frequently reported primary damage among comparable M4 listings is Front End (22 of the group).
Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.