carfindervin@gmail.com
Home » Inventory » BMW » 2024 BMW M3 – WBS63AY00RFS09107
VIN: WBS63AY00RFS09107

2024 BMW M3 – WBS63AY00RFS09107

$58,250
Hide car
MakeBMW
ModelM3
Odometer6014
FuelGasoline

Description

This 2024 BMW M3 (White) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS63AY00RFS09107), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2024 BMW M3 (White) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 6,014 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Front End
  • Secondary damage: Unknown

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS63AY00RFS09107
Lot ID42568089
Sale Date2025-10-15
ColorWhite
Odometer6014
Fuel TypeGasoline
Primary DamageFront End
Secondary DamageUnknown

VIN Breakdown for WBS63AY00RFS09107

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS63AY00RFS09107 reveals about this 2024 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)R — 2024
Assembly plant code (11th digit)F
Vehicle descriptor section (VDS)63AY0
VIN check digit (9th)0
Production serial numberS09107

About This 2024 BMW M3

Listed out of the auction yard in Atlanta South (GA), this 2024 BMW M3 is catalogued here under VIN WBS63AY00RFS09107. The listing notes 6,014 miles on the clock and a White exterior. All of the data here is anchored to the VIN, so it lines up with independent history and title checks.

Understanding the Reported Damage

Front-end damage usually involves the bumper, hood, radiator support, headlights and sometimes the airbags. Inspect the photos for frame or core-support deformation, which is costlier to repair than cosmetic panel damage.

Frequently Asked Questions

Is the VIN WBS63AY00RFS09107 salvage or auction history?

This page collects the public auction record tied to VIN WBS63AY00RFS09107. It indicates the 2024 BMW M3 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2024 BMW M3 located?

The most recent auction listing placed this vehicle at Atlanta South (GA). Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS63AY00RFS09107?

Yes. Enter the VIN WBS63AY00RFS09107 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS63AY00RFS09107, not stock photography.

Market analysis for this 2024 BMW M3

We hold 50 comparable BMW M3 auction results from 2022–2026. Across those sales the average price was $34,563, ranging from $7,300 to $66,500.

This particular car sold for $58,250 — 68.5% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 6,014 miles compares with an average of 10,658 miles across the comparable group — roughly 4,644 miles less.

The most frequently reported primary damage among comparable M3 listings is Front End (22 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.