carfindervin@gmail.com
Home » Inventory » BMW » 2024 BMW M4 – WBS33BA01RCP16148
VIN: WBS33BA01RCP16148

2024 BMW M4 – WBS33BA01RCP16148

$40,500
Hide car
MakeBMW
ModelM4
Odometer11532
FuelFlexible Fuel

Description

This 2024 BMW M4 (White) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS33BA01RCP16148), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2024 BMW M4 (White) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 11,532 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Vandalized
  • Secondary damage: Mechanical

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS33BA01RCP16148
Lot ID47478585
Sale Date2025-04-25
ColorWhite
Odometer11532
Fuel TypeFlexible Fuel
Primary DamageVandalized
Secondary DamageMechanical

VIN Breakdown for WBS33BA01RCP16148

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS33BA01RCP16148 reveals about this 2024 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)R — 2024
Assembly plant code (11th digit)C
Vehicle descriptor section (VDS)33BA0
VIN check digit (9th)1
Production serial numberP16148

About This 2024 BMW M4

Recorded at the auction yard in CA - Long Beach, this 2024 BMW M4 carries the VIN WBS33BA01RCP16148 and the details below. At the time it was catalogued the odometer showed 11,532 miles, and the exterior is listed as White. Since the record is VIN-linked, it stays consistent with title, insurance and accident databases where available.

Understanding the Reported Damage

The auction recorded the primary damage as "Vandalized." Review the photos to judge whether it is cosmetic or structural before drawing conclusions about repair cost.

Frequently Asked Questions

Is the VIN WBS33BA01RCP16148 salvage or auction history?

This page collects the public auction record tied to VIN WBS33BA01RCP16148. It indicates the 2024 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2024 BMW M4 located?

The most recent auction listing placed this vehicle at CA - Long Beach. Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS33BA01RCP16148?

Yes. Enter the VIN WBS33BA01RCP16148 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS33BA01RCP16148, not stock photography.

Market analysis for this 2024 BMW M4

We hold 44 comparable BMW M4 auction results from 2022–2026. Across those sales the average price was $35,832, ranging from $15,400 to $60,550.

This particular car sold for $40,500 — 13.0% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 11,532 miles compares with an average of 9,951 miles across the comparable group — roughly 1,581 miles more.

The most frequently reported primary damage among comparable M4 listings is Front End (22 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.