carfindervin@gmail.com
Home » Inventory » BMW » 2024 BMW M4 – WBS43AZ01RCP07632
VIN: WBS43AZ01RCP07632

2024 BMW M4 – WBS43AZ01RCP07632

$41,750
Hide car
MakeBMW
ModelM4
Odometer14413
FuelGasoline

Description

This 2024 BMW M4 (Green) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS43AZ01RCP07632), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2024 BMW M4 (Green) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 14,413 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Unknown
  • Secondary damage: Unknown

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS43AZ01RCP07632
Lot ID46664606
Sale Date2026-03-23
ColorGreen
Odometer14413
Fuel TypeGasoline
Primary DamageUnknown
Secondary DamageUnknown

VIN Breakdown for WBS43AZ01RCP07632

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS43AZ01RCP07632 reveals about this 2024 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)R — 2024
Assembly plant code (11th digit)C
Vehicle descriptor section (VDS)43AZ0
VIN check digit (9th)1
Production serial numberP07632

About This 2024 BMW M4

This 2024 BMW M4 surfaced at the auction yard in Sayreville (NJ) and is now fully searchable by its VIN. Auction records put this car at 14,413 miles with a reported Green finish. All of the data here is anchored to the VIN, so it lines up with independent history and title checks.

Understanding the Reported Damage

The auction recorded the primary damage as "Unknown." Review the photos to judge whether it is cosmetic or structural before drawing conclusions about repair cost.

Frequently Asked Questions

Is the VIN WBS43AZ01RCP07632 salvage or auction history?

This page collects the public auction record tied to VIN WBS43AZ01RCP07632. It indicates the 2024 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2024 BMW M4 located?

The most recent auction listing placed this vehicle at Sayreville (NJ). Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS43AZ01RCP07632?

Yes. Enter the VIN WBS43AZ01RCP07632 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS43AZ01RCP07632, not stock photography.

Market analysis for this 2024 BMW M4

We hold 44 comparable BMW M4 auction results from 2022–2026. Across those sales the average price was $35,804, ranging from $15,400 to $60,550.

This particular car sold for $41,750 — 16.6% above the comparable average. Prices above the comparable average typically indicate lighter damage, lower mileage, or a higher trim than the group norm.

Its recorded odometer reading of 14,413 miles compares with an average of 9,861 miles across the comparable group — roughly 4,552 miles more.

The most frequently reported primary damage among comparable M4 listings is Front End (22 of the group).

Figures are calculated from CarFinderVIN's own record of auction results and refresh as new sales are added.