carfindervin@gmail.com
Home » Inventory » BMW » 2024 BMW M4 – WBS43AZ0XRCN92500
VIN: WBS43AZ0XRCN92500

2024 BMW M4 – WBS43AZ0XRCN92500

$60,550
Hide car
MakeBMW
ModelM4
Odometer15765
FuelGasoline

Description

This 2024 BMW M4 (Black) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS43AZ0XRCN92500), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2024 BMW M4 (Black) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 15,765 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: Rear End
  • Secondary damage: Rear End

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS43AZ0XRCN92500
Lot ID39751807
Sale Date2024-09-30
ColorBlack
Odometer15765
Fuel TypeGasoline
Primary DamageRear End
Secondary DamageRear End

VIN Breakdown for WBS43AZ0XRCN92500

Every 17-character VIN encodes specific facts about where and when the vehicle was built. Here is what the VIN WBS43AZ0XRCN92500 reveals about this 2024 BMW:

World Manufacturer Identifier (WMI)WBS — BMW
Country of manufactureGermany
Model year code (10th digit)R — 2024
Assembly plant code (11th digit)C
Vehicle descriptor section (VDS)43AZ0
VIN check digit (9th)X
Production serial numberN92500

About This 2024 BMW M4

This 2024 BMW M4 surfaced at the auction yard in Anaheim Consolidated (CA) and is now fully searchable by its VIN. The listing notes 15,765 miles on the clock and a Black exterior. Because every figure on this page is bound to the VIN, you can cross-check it against any third-party history report.

Understanding the Reported Damage

Rear-end damage commonly affects the bumper, trunk floor, tail lights and exhaust. Check whether the rear frame rails or trunk pan are buckled, as that signals a harder structural hit.

Frequently Asked Questions

Is the VIN WBS43AZ0XRCN92500 salvage or auction history?

This page collects the public auction record tied to VIN WBS43AZ0XRCN92500. It indicates the 2024 BMW M4 passed through a North American insurance or salvage auction, where the photos and reported damage shown here were recorded.

Where was this 2024 BMW M4 located?

The most recent auction listing placed this vehicle at Anaheim Consolidated (CA). Auction locations can change if a car is relisted.

Can I get a full history report for VIN WBS43AZ0XRCN92500?

Yes. Enter the VIN WBS43AZ0XRCN92500 into the search box at the top of the page to pull the available history, and cross-reference it with an independent provider for title and odometer records.

Are the photos of this exact car?

Yes — the images on this page are the original auction photos captured for VIN WBS43AZ0XRCN92500, not stock photography.