carfindervin@gmail.com
Home » Inventory » BMW » 2025 BMW M4 – WBS23HK00SCT37239
VIN: WBS23HK00SCT37239

2025 BMW M4 – WBS23HK00SCT37239

$34,250
Hide car
MakeBMW
ModelM4
Odometer2868
FuelGAS

Description

This 2025 BMW M4 (BLACK) comes from a major insurance auction in the USA or Canada. All information on this page is linked to the vehicle’s VIN (WBS23HK00SCT37239), which helps confirm where the car was listed and what condition it was in at the time of sale.

The photos shown are real auction photos of this exact vehicle. It’s worth reviewing them closely—auction listings don’t always mention every detail, and images often reveal things like scratches, dents, missing trim, or other visible issues.

Technical details

This 2025 BMW M4 (BLACK) is equipped with an engine designed to balance performance and efficiency. According to the auction listing, the vehicle had 2,868 miles at the time of sale.

Condition and reported damage

At the auction, the following damage was reported:

  • Primary damage: FRONT END
  • Secondary damage: MINOR DENT/SCRATCHES

Insurance-auction vehicles are typically sold with some form of damage or defect, ranging from minor cosmetic issues to more serious problems. To get the clearest picture, compare the reported damage with the photos.

Additional information

Each listing on our site is connected to the vehicle’s VIN, allowing you to cross-check details such as history, ownership records, and accident/insurance information (where available). This vehicle was listed through a large insurance-auction platform in the United States, which helps ensure the information is traceable.

For the most accurate assessment, review all photos and all listed specifications before making any decisions.

Technical Specifications

VIN NumberWBS23HK00SCT37239
Lot ID82076914
Sale Date2025-01-08
ColorBLACK
Odometer2868
Fuel TypeGAS
Primary DamageFRONT END
Secondary DamageMINOR DENT/SCRATCHES